Back to work
W-02·Software · Manufacturing

An operating system for a window factory

ManufacturingIntegrationsPlanningWarehouseReporting

The system that runs production, installation, stock and reporting for a PVC-window manufacturer — wired directly into the KLAES and Stijene tools the floor already uses.

FIG.Method
01 · CHALLENGEWhat's really wrong02 · APPROACHHow we approach it03 · OUTCOMEWhat changes
01 · Challenge

A growing PVC-window manufacturer ran production, installation, stock and reporting across disconnected tools and spreadsheets. Orders designed in KLAES and produced on Stijene lived in separate worlds, so planning the floor and the fitting crews meant re-keying data and trusting memory.

02 · Approach

We built one system that sits on top of the tools already in use. It reads orders straight from KLAES and the Stijene production line, then drives planning, tracking, stock and reporting from a single source of truth — connecting what works rather than replacing it.

03 · Outcome

Production and installation are planned and tracked in one place, stock reflects what's really on the shelves, and management sees the numbers without assembling them by hand. The factory runs on its own software instead of around it.

A custom operating system built for Senčila Senica d.o.o., a manufacturer of PVC windows.

What it runs

  • Production planning & tracking — schedule the shop floor and follow each order from cut to finished unit.
  • Installation planning & tracking — plan fitting crews and dates, and track every job through to completion.
  • Warehouse management — real-time stock of profiles, glass and hardware, tied to what production consumes.
  • Analytics & reporting — throughput, lead times and workload in views management actually uses.

Wired into the floor

  • KLAES — window and door orders flow in from the design and costing system, with no re-keying.
  • Stijene — the system connects to the production line so plans reflect what the machines are actually doing.
  • One source of truth — office and shop floor read the same live data.

Why it matters

Manufacturing software fails when it fights the machines. By integrating with KLAES and Stijene instead of duplicating them, the system fit how the factory already works from day one — and then made it faster.

Open for work

Have a similar problem?

Tell us what you're trying to achieve. We'll answer with an honest read on how we'd approach it — not a sales deck.